Zhengzhou, Henan, China [email protected]

Whatsapp : +8613910832929

Contents

Build a Road Marking Paint Factory | Joint Venture Thermoplastic Plant Setup Guide

Build a Road Marking Paint Factory | Joint Venture Thermoplastic Plant Setup Guide

By Alan Xie, International Projects Manager, Tianhua Group – Global Road Marking Solutions

Why Countries are Building Local Road Marking Paint Factories

In the last five years, governments and contractors have realized that importing 100% of their road marking materials creates high logistics costs, long supply times, and unstable budgets. More highway agencies now prefer local manufacturing—either through a joint venture or technical partnership—to secure a steady supply of thermoplastic road marking paint, improve quality control, and reduce project delays.

Tianhua Group has assisted partners in Southeast Asia, Africa, and the Middle East in establishing local production units. Each project is slightly different, but the core principles remain similar: reliable raw materials, stable formulas, correct production equipment, trained technicians, and a clear go-to-market strategy.

Road Marking Paint Factory

What You Need to Start a Thermoplastic Road Marking Paint Factory

Setting up a plant is not complicated, but it requires a structured approach. Below is a practical breakdown used in real JV projects:

1. Market Assessment
Annual road construction length, maintenance cycle, government tenders, and private contractors determine the minimum viable output. Most JV factories target 3,000–12,000 tons/year capacity in the first stage.

2. Factory Layout Planning
Thermoplastic paint requires space for raw material storage, melting & mixing systems, cooling, crushing, packaging, and finished goods. We provide layout drawings customized to your land area.

3. Equipment Selection
This includes industrial mixers, heating kettles, cooling conveyor lines, crushers, bagging machines, glass bead feeders, and testing equipment. Automation level depends on labor availability and expected production scale.

4. Formula & Raw Materials
A stable formula is more important than any single ingredient. Tianhua supplies resin, pigments, special fillers, softening agents, and additives with proven performance in high-temperature, rainy, desert, or snow regions.

5. Engineering Team & Training
We send senior engineers for plant installation, commissioning, and hands-on training. Your team learns melting behavior, color control, bead compatibility, adhesion testing, and field application techniques.

6. Certification & Testing
We prepare documents for compliance with AASHTO M249, EN 1871, JT/T280, SASO and local standards. Lab test equipment can be included in the package.

7. Local Marketing & Distribution
After production starts, Tianhua assists with Google Ads, multilingual landing pages, SEO, product photography, and distributor recruitment to help you gain market share quickly.

What Tianhua Group Provides in a Joint Venture Factory

We simplify the entire process so partners can start production confidently:

• High-quality raw materials at factory price
• Formulas for standard, premium, airport-grade, low-VOC, cold region, and heavy-traffic types
• Complete production equipment tailored to budget and capacity
• Technical engineers for installation + training
• Ongoing QA/QC support + annual formulation upgrades
• OEM packaging design for local branding
• Google SEO + Google Ads + distributor recruitment campaigns in your region
• Long-term supply contract ensuring stability and competitive cost

Example Factory Cost Structure (Reference)

Typical setup for a medium-scale thermoplastic paint factory (6,000–10,000 tons/year):

Item Estimated Cost (USD)
Production line (full set) 80,000 – 150,000
Raw material stock (initial 100–200 tons) 30,000 – 90,000
Laboratory & testing equipment 6,000 – 18,000
Factory renovation & utilities 10,000 – 25,000
Engineering team (on-site) Included in JV model
Training & formulation package Included
Google advertising campaigns 1,000 – 3,000 monthly (flexible)

Factory Price & Supply Details

Material Factory Price (USD/ton)
Thermoplastic White (Standard) 270 – 420
Thermoplastic Yellow (Premium) 480 – 700
30% Premixed Glass Bead Formula 480 – 550
Glass Beads (RI 1.5 / 1.6) 650 – 1,200
Resin + Filler Package Discussed per region
OEM Packaging Available for private label

Why a JV Factory with Tianhua Works Well

Partners often choose a JV because they want control of local distribution but prefer not to reinvent the entire manufacturing process. Our model reduces learning curve and investment risk. Raw materials come directly from us with stable quality; you simply mix, heat, and package according to the formula.

How to Build a Road Marking Paint Factory

Most partners achieve stable production within 45–60 days from installation. Some regions—where road construction is accelerating—recover investment within 1–2 years due to the high demand for markings.

Next Steps: Start Building Your Factory

If you are considering building a thermoplastic road marking paint factory, send us the following:

• Country / city
• Planned capacity (tons/year)
• Available land or building size
• Your preferred investment model (JV / OEM / local dealer)
• Target standards (AASHTO / EN / JT/T / SASO)

We will prepare a customized project proposal, factory layout, equipment list, and financial plan within 3–5 working days.

Contact Tianhua Group — Let’s Build Your Road Marking Paint Factory Together.

Leave a Message